Reconstruction of the Nizhneturinskaya GRES (State Regional Power Station), Nizhnyaya Tura, Sverdlovsk Region

The project aims to build state-of-the-art power infrastructure facilities and boost fuel efficiency. Nizhneturinskaya GRES in the Sverdlovsk Region is being reconstructed to expand the power station capacity to 460 MW.

Reconstruction of the Nizhneturinskaya GRES (State Regional Power Station)
Other projects
Ust-luga’s gas chemicals facility
Ust-luga’s gas chemicals facility
Project cost
is limited to RUB 111bn
VEB participation
Natural gas processing plant in Nakhodka
Natural gas processing plant in Nakhodka
Project cost
VEB participation
Shchekinoazot’s methanol production site phase three
Shchekinoazot’s methanol production site phase three
RUB 22bn
Project cost
RUB 4.5bn
VEB participation

Электронный офис клиента в разработке

Закрыть
Write a letter
The following required fields are missing: Your name
The following required fields are missing: Your e-mail
The following required fields are missing: Your message
Your message has been sent.
Leave feedback

It is important for us to know your opinion about the bank in order to make our work even better.

The following required fields are missing: Your name
The following required fields are missing: Your company
The following required fields are missing: Your e-mail
The following required fields are missing: Your message
Your message has been sent.